Hi all - was out bush last week, on my way home I decided to get a few shots of this Wind Farm - I should have taken a 3rd one on Manual with a faster shutter speed and set my own AV, when I tried TV mode on 200 the av was way too small at around 4.5 for the effect I wanted - any feedback, c &c welcome.some facts on the wind farm below:
The largest wind farm currently operating in NSW is the Capital Wind Farm near
Goulburn. With a generating capacity of 141 megawatts,
it supplies power equivalent to the needs of around 60,000 households.
Around 80 % of its output is used to supply clean energy to power Sydney’s
desalination plant.
pic 1 tv1,av 22,iso 100(auto)
pic 2,tv 1/30,av 13, iso 500 (auto)